Skip to content
No power or burning smell? We answer 24/7. Call (404) 555-0142
Brightwire Electric

Services

Panel Upgrades

An old 100 amp panel was fine in 1995. Add an EV charger, a heat pump and a new oven and it starts tripping. We size the service to your real load, pull the permit, schedule the Georgia Power disconnect and leave you with a labeled, inspected panel, usually in a single day.

  • Licensed: Georgia Electrical Contractor #EN210042
  • 24/7 emergency service
  • Based in Lawrenceville, GA

What customers say

  • Sample review for the demo site. They swapped our panel in a day and left the garage cleaner than they found it.

    Sample Customer, Lawrenceville

Common questions

How long does a panel upgrade take?

Most 200 amp swaps take one working day, including the power company disconnect and reconnect.

Do I need a panel upgrade for an EV charger?

Not always. We check your spare capacity first and only recommend an upgrade when the load requires it.

Ready for a free quote?

Tell us what you need. Most requests get a call back within two business hours.